Main Subjects = Production Planning & Control
Number of Articles: 23
1. Integrated hybrid flow shop scheduling and vehicle routing problem

Articles in Press, Accepted Manuscript, Available Online from 11 November 2020

Raheleh Moazami Goodarzi; Fardin Ahmadizar; Hiwa Farughi


2. Production planning and efficiency evaluation of a three-stage network

Articles in Press, Accepted Manuscript, Available Online from 27 October 2020

Ehsan Vaezi; Seyyed Esmaeil Najafi; Seyed Mohammad Hajimolana; Farhad Hosseinzadeh Lotfi; Mahnaz Ahadzadeh Namin


4. Assembly line balancing problem with skilled and unskilled workers: The advantages of considering multi-manned workstations

Volume 13, Special issue: 16th International Industrial Engineering Conference, Winter 2020, Pages 66-77

Azadeh Esfandyari; Abdolreza Roshani


5. An integrated decision making approach for glass container industries

Volume 12, Issue 2, Spring 2019, Pages 138-150

Seyed Mohammad Ali Khatami Firouzabadi; Maghsoud Amiri; Mohammad Taghi Taghavifard; Nima Fakhim Hashemi


6. Simultaneous production planning and scheduling in a hybrid flow shop with time periods and work shifts

Volume 12, Issue 1, Winter 2019, Pages 198-214

Iman Hassanzadeh Nodeh; Seyed Hessameddin Zegordi


7. An economic-statistical model for production and maintenance planning under adaptive non-central chi-square control chart

Volume 12, Special issue on Statistical Processes and Statistical Modeling, Winter 2019, Pages 35-65

ali salmasnia; farzaneh Soltany; maryam noroozi; behnam Abdzadeh


9. A chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability

Volume 10, special issue on scheduling, Autumn 2017, Pages 1-16

Mohammad Mehdi Lotfi; Leila Izadkhah


11. Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage

Volume 10, Issue 3, Summer 2017, Pages 92-112

Parviz Fattahi; Fatemeh Daneshamooz


12. Two-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect

Volume 10, Issue 3, Summer 2017, Pages 16-32

Armin Jabarzadeh; Mohammad Rostami; Mahdi Shahin; Kamran Shahanaghi


13. Solving a multi-objective mixed-model assembly line balancing and sequencing problem

Volume 10, special issue on production and inventory, Winter 2017, Pages 155-170

Masoud Rabani; Mehdi Yazdanbakhsh; Hamed Farrokhi-Asl


14. Evaluating alternative MPS development methods using MCDM and numerical simulation

Volume 10, special issue on production and inventory, Winter 2017, Pages 73-90

Mohammad Mehdi Lotfi; Negin Najafian


15. Simultaneous coordination of review period and order-up-to-level in a manufacturer-retailer chain

Volume 10, special issue on production and inventory, Winter 2017, Pages 1-17

Maryam Johari; Seyyed-Mahdi Hosseini-Motlagh; Mohammadreza Nematollahi


16. Enhanced chromosome repairing mechanism based genetic algorithm approach for the multi-period perishable production inventory-routing problem

Volume 10, special issue on production and inventory, Winter 2017, Pages 30-56

Parviz Fattahi; Mehdi Tanhatalab; Mahdi Bashiri


17. Optimal production and marketing planning with geometric programming approach

Volume 10, special issue on production and inventory, Winter 2017, Pages 18-29

Seyed Reza Moosavi Tabatabaei; Seyed Jafar Sadjadi; Ahmad Makui


19. Economic manufacturing model under partial backordering and sustainability considerations

Volume 8, Issue 2, Spring 2015, Pages 86-96

Vahid Reza Soleymanfar; Ata Allah Taleizadeh; Nadia Pourmohammad Zia


20. Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line

Volume 5, Issue 2, Summer 2011, Pages 107-119

Masoumeh Mahdieh; Mehdi Bijari; Alistair Clark


21. A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times

Volume 5, Issue 1, Spring 2011, Pages 1-19

Mohammad Aliabadi; Fariborz Jolai; Esmaeil Mehdizadeh; Masoud Jenabi


23. Scheduling Accumulated Rework in a Normal Cycle: Optimal Batch Production with Minimum Rework Cycles

Volume 2, Issue 3, Autumn 2008, Pages 236-249

Babak Haji; Alireza Haji; Ali Rahmati Tavakol3