Araújo, F.B., Costa, A, M., & Miralles, C. (2012). Two extensions for the ALWABP: Parallel stations and collaborative approach. International Journal of Production Economics, 140, 483–495.
Bartholdi, J.J. (1993). Balancing two-sided assembly lines: a case study. International Journal of Production Research, 31(10), 2447–2461.
|
Battaïa, O., & Dolgui, A. (2013). A taxonomy of line balancing problems and their solution approaches. International Journal of Production Economics, 142(2), 259–277.
|
Blum, C., & Miralles, C. (2011). On solving the assembly line worker assignment and balancing problem via beam search. Computers & Operations Research, 38, 328–339.
|
Borba, L., & Ritt, M. (2014). A heuristic and a branch-and-bound algorithm for the Assembly Line Worker Assignment and Balancing Problem. Computers & Operations Research 4587–4596.
|
Boysen, N., Fliedner, M., & Scholl, A. (2007). A classification of assembly line balancing problems. European Journal of Operational Research, 183, 674–693.
|
Boysen, N., Fliedner, M., & Scholl, A. (2008). Assembly line balancing: Which model to use when?. International Journal of Production Economics, 111, 509–528.
|
Cannas, V. G., Pero, M., Pozzi, R., Tommaso Rossi, T. (2018). Complexity reduction and kaizen events to balance manual assembly lines: an application in the field. International Journal of Production Research, 1-18.
|
Chutima, P., & Chimklai, P. (2012). Multi-objective two-sided mixed-model assembly line balancing using particle swarm optimisation with negative knowledge. Computers and Industrial Engineering, 62, 39–55.
|
Costa, A. M., & Miralles, C. (2009). Job rotation in assembly lines employing disabled workers. International Journal of Production Economics, 120, 625–632.
|
Deb, K. (2001). Multi-Objective Optimization Using Evolutionary Algorithms. John Wiley and Sons, Inc, New York, NY, USA.
|
Dolgui, A., Kovalev, S., Kovalyov, M. Y., Malyutin, S., Soukhal, A. (2018). Optimal workforce assignment to operations of a paced assembly line. European Journal of Operational Research 24(1), 200-211.
|
|
Hamta, N., Fatemi Ghomi, S.M.T., Jolai, F., & Akbarpour Shirazi, M. (2013). A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect. International Journal of Production Economics, 141(1), 99-111.
|
Hu, S.J., Ko, J., Weyand, L., El Maraghy, H.A., Lien, T.K., Koren, Y., Bley, H., Chryssolouris, G., Nasr, N., & Shpitalni, M. (2011). Assembly system design and operations for product variety. CIRP Annals-Manufacturing Technology, 60, 715–733.
|
Kellegöz, T. (2017). Assembly line balancing problems with multi-manned stations: a new mathematical formulation and Gantt based heuristic method. Annals of Operations Research 253(1), 377-404.
|
Kennedy, J., & Eberhart, R.C. (1995). Particle swarm optimization. In proceedings of IEEE international Conference on Neural Networks (Perth, Australia). 1942-1948.
|
Miralles, C., García-Sabater, J. P., Andrés, C., & Cardos, M. (2007). Advantages of assembly lines in Sheltered Work Centres for Disabled. A case study. International Journal of Production Economics, 110, 187–197.
|
Miralles, C., Garía-Sabater, J. P., Andrés, C., & Cardós, M. (2008). Branch and bound procedures for solving the Assembly Line Worker Assignment and Balancing Problem: Application to Sheltered Work centres for Disabled. Discrete Applied Mathematics, 156, 352-367.
|
Moreira, M. C. O., Ritt, M., Costa, A. M., & Chaves, A. A. (2012). "Simple heuristics for the assembly line worker assignment and balancing problem. Journal of Heuristics, 18, 505–524.
|
Mutlu, Ö., Polat, O., & Supciller, A. A. (2013). An iterative genetic algorithm for the assembly line worker assignment and balancing problem of type-II. Computers & Operations Research, 40 (1), 418–426.
|
Özcan, U., & Toklu, B. (2009). Balancing of mixed-model two-sided assembly lines. Computers and Industrial Engineering, 57, 217–227.
|
Özcan, U., Gokcen, H., & Toklu, B. (2010). Balancing parallel two-sided assembly lines. International Journal of Production Research, 48 (16), 4767–4784.
|
Pastor, R. (2011). LB-ALBP: the lexicographic bottleneck assembly line balancing problem. International Journal of Production Research, 49(8), 2425-2442.
|
Pastor, R., Chueca, I., & García-Villoria, A. (2012). A heuristic procedure for solving the Lexicographic Bottleneck Assembly Line Balancing Problem (LB-ALBP). International Journal of Production Research, 50(7), 1862-1876.
|
Purnomo, H. D., Wee, H. M., & Rau, H. (2013). Two-sided assembly lines balancing with assignment restriction. Mathematical and Computer Modeling, 57, 189–199.
|
Roshani, A. R., Giglio, D. (2017). Simulated annealing algorithms for the multi-manned assembly line balancing problem: minimising cycle time. International Journal of Production Research 55(10), 2731-2751.
|
Salveson, M.E. (1955). The assembly line balancing problem. Journal of Industrial Engineering, 6(3), 18–25.
|
Scholl, A. (1999). balancing and sequencing of assembly lines. Physica-Verlag.
|
Scholl, A., & Becker, C. (2006). State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. European Journal of Operational Research, 168, 666–693.
|
Simaria, A. S., & Vilarinho, P. M. (2009). 2-ANTBAL: An ant colony optimization algorithm for balancing two-sided assembly lines. Computers & Industrial Engineering, 56, 489–506.
|
Sirovetnukul, R., & Chutima, P. (2010). The Impact of Walking Time On U-Shaped Assembly Line Worker Allocation Problems. Engineering Journal, 14 (2), 53-78.
|
Song, B.L., Wong, W.K., Fan, J.T., & Chan, S.F. (2006). A recursive operator allocation approach for assembly line balancing optimization problem with the consideration of operator efficiency. Computers & Industrial Engineering, 51, 585–608.
|
Taguchi, G. (1986). Introduction to Quality Engineering. Asian Productivity organization.
|
Vilà, M., & Pereira, J. (2014). A branch-and-bound algorithm for assembly line worker assignment and balancing problems. Computers & Operations Research, 44, 105–114.
|
Xiaofeng, H., Erfei, W., Jinsong, B., & Ye, J. (2010). A branch-and-bound algorithm to minimize the line length of a two-sided assembly line. European Journal of Operational Research, 206, 703–707.
|
Zaman, T., Paul, S. K., & Azeem, A. (2012). Sustainable operator assignment in an assembly line using genetic algorithm. International Journal of Production Research, 50 (18), 5077–5084.
|
Zhang, W., Gen, M., Lin, L. (2008). A Multi-objective Genetic Algorithm for Assembly Line Balancing Problem with Worker Allocation, IEEE International Conference on Systems, Man and Cybernetics.
|