Main Subjects = Scheduling
1. Job shop scheduling problem based on learning effects, flexible maintenance activities and transportation times

Articles in Press, Accepted Manuscript, Available Online from 28 June 2019

hamed mousavipoor; Hiwa Farughi; Fardin Ahmadizar


2. Optimization of parallel machine scheduling problem with human resiliency engineering: A new hybrid meta-heuristics approach

Volume 12, Issue 2, Spring 2019, Page 31-45

Masoud Rabani; soroush aghamohamadi; Reza Yazdanparast


3. Simultaneous production planning and scheduling in a hybrid flow shop with time periods and work shifts

Volume 12, Issue 1, Winter 2019, Page 198-214

Iman Hassanzadeh Nodeh; Seyed Hessameddin Zegordi


4. Reference group genetic algorithm for flexible job shop scheduling problem with multiple objective functions

Volume 11, Issue 4, Autumn 2018, Page 153-169

Mohammadali Beheshtinia; Niloofar Ghazivakili


5. Scheduling production and transportation in multi-site supply chain simultaneously regarding to exclusive suppliers

Volume 11, Issue 4, Autumn 2018, Page 170-189

Seyed AmirMohammad Khatibi; Mostafa Moghimi; mohammad abdolshah


6. Planning in a cross dock network with an operational scheduling overview

Volume 11, Special issue: 14th International Industrial Engineering Conference, Summer 2018, Page 43-50

Sajjad Rahmanzadeh; Amin Shahmardan; Mir Saman Pishvaee; Armin Jabarzadeh


7. Minimizing the energy consumption and the total weighted tardiness for the flexible flowshop using NSGA-II and NRGA

Volume 11, Special issue: 14th International Industrial Engineering Conference, Summer 2018, Page 150-162

Mohammad Mahdi Nasiri; Mojtaba Abdollahi; Ali Rahbari; Navid Salmanzadeh; Sadegh Salesi


9. A novel mathematical model for a hybrid flow shop scheduling problem under buffer and resource limitations-A case study

Volume 10, special issue on scheduling, Autumn 2017, Page 58-77

Ghasem Safari; Ashkan Hafezalkotob; Mohammad Khalilzadeh


10. A Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities

Volume 10, special issue on scheduling, Autumn 2017, Page 92-118

Farhad Habibi; Farnaz Barzinpour; Seyed Jafar Sadjadi


11. A mathematical model for sustainable probabilistic network design problem with construction scheduling considering social and environmental issues

Volume 10, special issue on scheduling, Autumn 2017, Page 17-37

Reza Mahmoudi; Mahdi Alinaghian; Hamed Mogouie


13. A chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability

Volume 10, special issue on scheduling, Autumn 2017, Page 1-16

Mohammad Mehdi Lotfi; Leila Izadkhah


14. A New model for integrated lot sizing and scheduling in flexible job shop problem

Volume 10, Issue 3, Summer 2017, Page 72-91

Rashed Sahraeian; Mohammad Rohaninejad; Mahmoud Fadavi


15. Two-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect

Volume 10, Issue 3, Summer 2017, Page 16-32

Armin Jabarzadeh; Mohammad Rostami; Mahdi Shahin; Kamran Shahanaghi


16. Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage

Volume 10, Issue 3, Summer 2017, Page 92-112

Parviz Fattahi; Fatemeh Daneshamooz


17. An improved memetic algorithm to minimize earliness–tardiness on a single batch processing machine

Volume 10, special issue on production and inventory, Winter 2017, Page 57-72

Neda Rafiee Parsa; Behrooz Karimi; Seyed Mohammad Moattar Husseini


18. A multi-objective genetic algorithm (MOGA) for hybrid flow shop scheduling problem with assembly operation

Volume 10, special issue on production and inventory, Winter 2017, Page 132-154

Seyed Mohammad Hassan Hosseini


19. Multi-period and multi-resource operating room scheduling and rescheduling using a rolling horizon approach: a case study

Volume 10, special issue on healthcare, Winter 2017, Page 97-115

Mohammad Mahdi Vali Siar; Saiedeh Gholami; Reza Ramezanian


21. Agent-based approach for cooperative scheduling

Volume 9, Issue 4, Autumn 2016, Page 26-46

javad Behnamian


22. Benders’ decomposition algorithm to solve bi-level bi-objective scheduling of aircrafts and gate assignment under uncertainty

Volume 9, Issue 3, Summer 2016, Page 111-126

Mohsen Sadegh Amal Nik; Javad Ansarifar; Faezeh Akhavizadegan


23. Truck scheduling problem in a cross-docking system with release time constraint

Volume 9, Issue 3, Summer 2016, Page 1-16

Jamal Arkat; Parak Qods; Fardin Ahmadizar


24. An approximation algorithm and FPTAS for Tardy/Lost minimization with common due dates on a single machine

Volume 9, Issue 2, Spring 2016, Page 1-19

Kamran Kianfar; Ghasem Moslehi; Ali Shahandeh Nookabadi


25. A Reschedule Design for Disrupted Liner Ships Considering Ports Demand and CO2 Emissions: The Case study of Islamic Republic of Iran Shipping Lines

Volume 9, Issue 1, Winter 2016, Page 126-148

Sogol Saremi; Seyyed-Mahdi Hosseini-Motlagh; Seyed Jafar Sadjadi