Akhavan Niaki, Seyed Taghi A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2012, Pages 198-207]
Aliabadi, Mohammad A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011, Pages 1-19]
Arivarignan, G. Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011, Pages 80-106]
Arunkumar, Natesan A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011, Pages 20-34]
B
Bhuiyan, Nadia Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011, Pages 142-153]
Bijari, Mehdi Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line [Volume 5, Issue 2, 2011, Pages 107-119]
C
Chauhan, Stayaveer.S. Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011, Pages 142-153]
Clark, Alistair Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line [Volume 5, Issue 2, 2011, Pages 107-119]
D
Damle, Siddharth B. Development of a Generic Risk Matrix to Manage Project Risks [Volume 5, Issue 1, 2011, Pages 35-51]
Das, Nandini Estimating Process Capability Indices Using Univariate g and h Distribution [Volume 5, Issue 2, 2011, Pages 120-127]
E
Eshghi, Kourosh Coordinating a Seller-Buyer Supply Chain with a Proper Allocation of Chain’s Surplus Profit Using a General Side-Payment Contract [Volume 5, Issue 2, 2011, Pages 63-79]
Eydi, Alireza Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand [Volume 5, Issue 4, 2012, Pages 208-229]
F
Fallah Nezhad, Mohammad Saber A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2012, Pages 198-207]
G
Ghalebsaz Jeddi, Babak A Note on Runway Capacity Definition and Safety [Volume 5, Issue 4, 2012, Pages 240-244]
Ghassemi-Tari, Farhad Development of PSPO Simulation Optimization Algorithm [Volume 5, Issue 3, 2011, Pages 128-141]
Grantham, Katie Development of a Generic Risk Matrix to Manage Project Risks [Volume 5, Issue 1, 2011, Pages 35-51]
H
Haji, Alireza Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011, Pages 52-62]
Haji, Alireza A Queueing-Inventory System with Repair Center for Defective Items and One-for-One Ordering Policy [Volume 5, Issue 4, 2012, Pages 230-239]
Haji, Babak A Queueing-Inventory System with Repair Center for Defective Items and One-for-One Ordering Policy [Volume 5, Issue 4, 2012, Pages 230-239]
Haji, Rasoul Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011, Pages 52-62]
J
Javazi, Leila Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand [Volume 5, Issue 4, 2012, Pages 208-229]
Jenabi, Masoud A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011, Pages 1-19]
Jolai, Fariborz A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011, Pages 1-19]
K
Karunamoorthy, Loganathan A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011, Pages 20-34]
M
Mahdieh, Masoumeh Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line [Volume 5, Issue 2, 2011, Pages 107-119]
Masihabadi (1985-2011), Sina Coordinating a Seller-Buyer Supply Chain with a Proper Allocation of Chain’s Surplus Profit Using a General Side-Payment Contract [Volume 5, Issue 2, 2011, Pages 63-79]
Mehdizadeh, Esmaeil A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011, Pages 1-19]
Murray, Susan L. Development of a Generic Risk Matrix to Manage Project Risks [Volume 5, Issue 1, 2011, Pages 35-51]
Muthukumar, Sambandam A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011, Pages 20-34]
O
Omranpour, Zohreh Development of PSPO Simulation Optimization Algorithm [Volume 5, Issue 3, 2011, Pages 128-141]
P
Pourghannad, Behrooz An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply [Volume 5, Issue 3, 2011, Pages 154-174]
R
Rajkumar, M. Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011, Pages 80-106]
S
Sadegheih, Ahmad A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2012, Pages 198-207]
Saffari, Mohammad Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011, Pages 52-62]
Safi, Mahsa Efficiency Analysis of Public Universities in Iran Using DEA Approach: Importance of Stakeholder’s Perspective [Volume 5, Issue 4, 2012, Pages 185-197]
Sajadifar, Mehdi An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply [Volume 5, Issue 3, 2011, Pages 154-174]
Sharifi, Shahram Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011, Pages 142-153]
Shavandi, Hassan The P-Center Problem under Uncertainty [Volume 5, Issue 3, 2011, Pages 175-184]
Sivakumar, B. Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011, Pages 80-106]
S.Monfared, M.A. Efficiency Analysis of Public Universities in Iran Using DEA Approach: Importance of Stakeholder’s Perspective [Volume 5, Issue 4, 2012, Pages 185-197]
T
Taghavi, Majid The P-Center Problem under Uncertainty [Volume 5, Issue 3, 2011, Pages 175-184]