Ahmadvand, M and Eqbali, H. (2021). Identifying and ranking risks in underground projects using the AHP method (practical example: Tehran metro line 7). scientific research journal of systems engineering and productivity, 1st Year, Issue 1. (In Persian).
Aliahmadi, A., Jafari-Eskandari, M., Mozafari, A., & Nozari, H. (2016). Comparing linear regression and artificial neural networks to forecast total productivity growth in Iran. International Journal of Information, Business and Management, 8(1), 93.
Bagheri, A., Hosseini, S. A., & Hosseini, S. (2023). Pathology of the employee performance evaluation system and providing solutions at the Iran oil pipeline and telecommunications company – northeast region. Scientific research journal of systems engineering and productivity, 3rd Year, Issue 1. (In Persian).
Balali, A., Valipour, A., Edwards, R & Moehler, R. (2021). Ranking effective risks on human resources threats in natural gas supply projects using ANP-COPRAS method: Case study of Shiraz. Reliability engineering and system safety.
https://doi.org/10.1016/j.ress.2021.107442.
Biuoseh, R., Momeni, M & Hamidizadeh, M. (2015). Identification of weaknesses and problems of domestic companies in the implementation of EPC projects in the oil and gas industry using the AHP method. The third national conference on improving domestic capacity with the approach of removing barriers to production in the face of sanctions. (In Persian).
Celik, E and Gul, M. (2021). Hazard identification, risk assessment and control for dam construction safety using an integrated BWM and MARCOS approach under interval type-2 fuzzy sets environment. Automation in construction.
https://doi.org/10.1016/j.autcon.2021.103699.
Eirgash, M A., Togan, V., Dede, T & Basri Basaga, H. (2023). Modified dynamic opposite learning assisted TLBO for solving Time- Cost optimization in generalized construction projects. Structures, Volume 53, 806-821. https://doi.org/10.1016/j.istruc.2023.04.091.
Elkliny, A. F., Sanad, H. M., & Etman, E. E. (2023). Time-costquality tradeoff considering resource scheduling problems. Ain shams engineering journal, 14(11), 102524. https://doi.org/10.1016/j.asej.2023.102524.
Fallah, M., & Nozari, H. (2021). Quantitative analysis of cyber risks in IoT-based supply chain (FMCG industries). Journal of Decisions and Operations Research, 5(4), 510-521.
Firouzbakht, A. E and Rezaian, A. (2022). Design and formulation of a digital transformation model for project-oriented organizations in Iran's oil and gas industry. Scientific research journal of management research in Iran, 26th Year, Issue 4. (In Persian).
Gas company standards and technology department. (2011). Technical specifications and gas transmission line commissioning guidelines. Volume 2 of the Contract. (In Persian).
Ghahremani-Nahr, J., Nozari, H., & Szmelter-Jarosz, A. (2024). Designing a humanitarian relief logistics network considering the cost of deprivation using a robust-fuzzy-probabilistic planning method. Journal of International Humanitarian Action, 9(1), 19.
Guo, S., Zhao, H., 2017. Fuzzy best-worst multi-criteria decision-making method and its applications. Knowledge-based systems. http://dx.doi.org/10.1016/j.knosys.2017.01.010.
Haghighi, M.H., Mousavi, S. M & Rajabzadeh, M. (2023). An optimization model for energy project scheduling problem with cost-risk-quality-social consideration trade-off under uncertainty: A real-world application. Energy Strategy Reviews.
https://doi.org/10.1016/j.esr.2023.101189.
Hatefi, M and Wahhabi, M. (2018). Strategic strategy of oil and gas projects, based on project management knowledge areas. Strategic Management Research, No (69). (In Persian).
Lawshe, C.H. (1975). A quantitative approach to content validity. Phrsonnhl psychoi.ogy.
Moaveni, S and Shari'atmadar, H. (2021). Ranking the causes of rework in construction projects in Iran and examining the impact of lean construction techniques. Amir kabir civil engineering journal, 53rd Year, Issue 1. http://dx.doi.org/ 10.22060/ceej.2019.14975.5801.
Movahed, A. B., Aliahmadi, A., Parsanejad, M., & Nozari, H. (2023). A systematic review of collaboration in supply chain 4.0 with meta-synthesis method. Supply Chain Analytics, 4, 100052.
Nozari, H., Abdi, H., & Szmelter-Jarosz, A. (2025). Goat Optimization Algorithm: A Novel Bio-Inspired Metaheuristic for Global Optimization. arXiv preprint arXiv:2503.02331.
Nozari, H., Movahed, A. B., & Movahed, A. B. (2024). The AIoE Revolution: Redefining Organizational Maturity in a Hyper-Connected World. Applied Innovations in Industrial Management, 4(1), 10-17.
Parasa, A. H., Gacuana, E. G. R., Halimb, E., Ngurah Perwira Redib, A. A & Germanc, J. D. (2024). Optimizing project scheduling using linear programming approach: A case study of heating ventilation & air conditioning mechanical installation. Procedia computer science, Seventh information systems international conference. https://doi.org/10.1016/j.procs.2024.03.054.
Rahman, M and Hyeok Han, S. (2024). Linear scheduling method-based multi-objective optimization for off-site construction manufacturing. Automation in construction, Volume 167, 105712. https://doi.org/10.1016/j.autcon.2024.105712.
Rezaei, J. (2015). Best-worst multi-criteria decision-making method. Omega.
https://doi.org/10.1016/j.omega.2014.11.009.
Rezaei, J. (2016). Best-worst multi-criteria decision-making method: Some properties and a linear model. Omega.
https://doi.org/10.1016/j.omega.2015.12.001.
Son, P. V. H and Khoi, L. N. Q. (2023). Building projects with time– cost– quality–environment trade- off optimization using adaptive selection slime mold algorithm. Asian journal of civil engineering, 1-18.
https://doi.org/10.1007/s42107-023-00572-x.