<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE ArticleSet PUBLIC "-//NLM//DTD PubMed 2.7//EN" "https://dtd.nlm.nih.gov/ncbi/pubmed/in/PubMed.dtd">
<ArticleSet>
<Article>
<Journal>
				<PublisherName>Iranian Institute of Industrial Engineering</PublisherName>
				<JournalTitle>Journal of Industrial and Systems Engineering</JournalTitle>
				<Issn>1735-8272</Issn>
				<Volume>12</Volume>
				<Issue>1</Issue>
				<PubDate PubStatus="epublish">
					<Year>2018</Year>
					<Month>11</Month>
					<Day>07</Day>
				</PubDate>
			</Journal>
<ArticleTitle>A multi-stage stochastic programming for condition-based maintenance with proportional hazards model</ArticleTitle>
<VernacularTitle></VernacularTitle>
			<FirstPage>18</FirstPage>
			<LastPage>38</LastPage>
			<ELocationID EIdType="pii">76728</ELocationID>
			
			
			<Language>EN</Language>
<AuthorList>
<Author>
					<FirstName>Ali</FirstName>
					<LastName>Yahyatabar</LastName>
<Affiliation>Faculty of Industrial Engineering, K.N. Toosi University of Technology, Tehran, Iran</Affiliation>

</Author>
<Author>
					<FirstName>Amir Abbas</FirstName>
					<LastName>Najafi</LastName>
<Affiliation>Faculty of Industrial Engineering, K.N. Toosi University of Technology, Tehran, Iran</Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2018</Year>
					<Month>02</Month>
					<Day>14</Day>
				</PubDate>
			</History>
		<Abstract>Condition-Based Maintenance (CBM) optimization using Proportional Hazards Model (PHM) is a kind of maintenance optimization problem in which inspections of a system relevant to its failure rate depending on the age and value of covariates are performed in time intervals. The general approach for constructing a CBM based on PHM for a system is to minimize a long run average cost per unit of time as an objective function in which the model is considered for an infinite span of time.  In this paper, a CBM model is presented based on two types of maintenance actions (minimal repair and replacement) to determine control limits to cope with the class of real-life problems in which a system would be planned for a specified planning horizon. An effective multi-stage stochastic programming approach is used to come up with the minimum expected cost given the state scenarios of the system in periods over a planning horizon. An extensive computational study is presented to demonstrate the efficiency of the proposed model through numerical instances solved by a novel hybrid meta-heuristic algorithm. A sensitivity is also performed on cost parameters to designate the effects of minimal repair cost and replacement cost in the proposed model.</Abstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">Condition Based Maintenance</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">proportional hazards model</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">multi-stage stochastic programming</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://www.jise.ir/article_76728_f54f4621935faced3a146de32741326d.pdf</ArchiveCopySource>
</Article>
</ArticleSet>
