Author = Ebrahim Teimoury
Truck and drone routing problem with soft time windows.

Volume 15, Issue 2, April 2023, Pages 20-34

Reza Rashid; Ebrahim Teimoury


The effect of demand aggregation on spare part supply chain planning: An empirical study of oil company.

Volume 15, Issue 2, April 2023, Pages 76-93

Vahid Babaveisi; Ebrahim Teimoury; Mohammad reza Gholamian


Analyzing the impact of sustainability on the network design and planning decisions in a spare part supply chain: an empirical investigation.

Volume 15, Issue 1, January 2023, Pages 1-25

Gholamreza Moini; Ebrahim Teimoury; Seyed Mohammad Seyedhosseini; Reza Radfar; Mahmood Alborzi


Integrating time and cost in dynamic optimization of supply chain recovery

Volume 13, Issue 4, November 2021, Pages 124-141

Alireza Khamseh; Ebrahim Teimoury; Kamran Shahanaghi


Repairable spare part supply chain: A hybrid priority-based particle swarm approach

Volume 14, Issue 1, January 2021, Pages 187-204

Gholamreza Moini; Ebrahim Teimoury; Seyed Mohammad Seyedhosseini; Reza Radfar; Mahmood Alborzi


The revenue and preservation-technology investment sharing contract in the fresh-product supply chain:A game-theoretic approach

Volume 11, Special issue: 14th International Industrial Engineering Conference, July 2018, Pages 132-149

Hossein Mohammadi; Mehdi Ghazanfari; Mir Saman Pishvaee; Ebrahim Teimoury


Design of 7×24 logistics system for hazardous materials (case study: distribution of gasoline)

Volume 9, Issue 4, October 2016, Pages 47-64

Amir Khosrojerdi; Ebrahim Teimoury; Armin Jabbarzedeh


Blood products supply chain design considering disaster circumstances (Case study: earthquake disaster in Tehran)

Volume 9, special issue on supply chain, January 2016, Pages 51-72

Jamal Nahofti Kohneh; Ebrahim Teymoury; Mir Saman Pishvaee