A
-
Academic performance
Efficiency Analysis of Public Universities in Iran Using DEA Approach: Importance of Stakeholder’s Perspective [Volume 5, Issue 4, 2011-2012, Pages 185-197]
-
Advantages of CM
A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011-2012, Pages 20-34]
-
AHP
A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011-2012, Pages 20-34]
-
Air Transportation
A Note on Runway Capacity Definition and Safety [Volume 5, Issue 4, 2011-2012, Pages 240-244]
B
-
Base stock policy
Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011-2012, Pages 52-62]
-
Basic period
A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011-2012, Pages 1-19]
C
-
Capacity
A Note on Runway Capacity Definition and Safety [Volume 5, Issue 4, 2011-2012, Pages 240-244]
-
Cellular Manufacturing
A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011-2012, Pages 20-34]
-
Cellular manufacturing system(CMS)
Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011-2012, Pages 142-153]
-
Contingency Planning
Development of a Generic Risk Matrix to Manage Project Risks [Volume 5, Issue 1, 2011-2012, Pages 35-51]
-
Continuous Review Policy
An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply [Volume 5, Issue 3, 2011-2012, Pages 154-174]
-
Control Threshold Policy
A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2011-2012, Pages 198-207]
D
-
Data Envelopment Analysis
Efficiency Analysis of Public Universities in Iran Using DEA Approach: Importance of Stakeholder’s Perspective [Volume 5, Issue 4, 2011-2012, Pages 185-197]
-
Defectives
A Queueing-Inventory System with Repair Center for Defective Items and One-for-One Ordering Policy [Volume 5, Issue 4, 2011-2012, Pages 230-239]
-
Determining lot sizes
A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011-2012, Pages 1-19]
E
-
Efficiency
Efficiency Analysis of Public Universities in Iran Using DEA Approach: Importance of Stakeholder’s Perspective [Volume 5, Issue 4, 2011-2012, Pages 185-197]
-
Exponential Distribution
A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2011-2012, Pages 198-207]
F
-
Facility location
The P-Center Problem under Uncertainty [Volume 5, Issue 3, 2011-2012, Pages 175-184]
-
Finite planning horizon
A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011-2012, Pages 1-19]
-
Flexible Flow Line
Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line [Volume 5, Issue 2, 2011-2012, Pages 107-119]
-
Flow shop
A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011-2012, Pages 1-19]
-
Fuzzy chance constrained
programming
Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand [Volume 5, Issue 4, 2011-2012, Pages 208-229]
G
-
Genetic algorithm
Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011-2012, Pages 142-153]
-
Genetic algorithm
Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand [Volume 5, Issue 4, 2011-2012, Pages 208-229]
H
-
Hybrid particle swarm optimization
A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011-2012, Pages 1-19]
I
-
Inventory
Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011-2012, Pages 52-62]
-
Inventory control
A Queueing-Inventory System with Repair Center for Defective Items and One-for-One Ordering Policy [Volume 5, Issue 4, 2011-2012, Pages 230-239]
L
-
Lot sizing
Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line [Volume 5, Issue 2, 2011-2012, Pages 107-119]
M
-
Machine Replacement Policy
A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2011-2012, Pages 198-207]
-
Manufacturing system
A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011-2012, Pages 20-34]
-
Mathematical Modelling
Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line [Volume 5, Issue 2, 2011-2012, Pages 107-119]
-
Multi objective capacitated arc routing problem
Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand [Volume 5, Issue 4, 2011-2012, Pages 208-229]
N
-
Nested Partition Algorithm
Development of PSPO Simulation Optimization Algorithm [Volume 5, Issue 3, 2011-2012, Pages 128-141]
-
Non-Zero Lead-time
An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply [Volume 5, Issue 3, 2011-2012, Pages 154-174]
O
-
One-for-one ordering
A Queueing-Inventory System with Repair Center for Defective Items and One-for-One Ordering Policy [Volume 5, Issue 4, 2011-2012, Pages 230-239]
P
-
Pareto ranking
Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand [Volume 5, Issue 4, 2011-2012, Pages 208-229]
-
Particle Swarm Optimization Algorithm
Development of PSPO Simulation Optimization Algorithm [Volume 5, Issue 3, 2011-2012, Pages 128-141]
-
Part-level
Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011-2012, Pages 142-153]
-
P-Center
The P-Center Problem under Uncertainty [Volume 5, Issue 3, 2011-2012, Pages 175-184]
-
Perishable
items
Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011-2012, Pages 80-106]
-
Poisson demand
Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011-2012, Pages 80-106]
-
Poisson demand
A Queueing-Inventory System with Repair Center for Defective Items and One-for-One Ordering Policy [Volume 5, Issue 4, 2011-2012, Pages 230-239]
-
Poisson
Demand
An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply [Volume 5, Issue 3, 2011-2012, Pages 154-174]
-
Positive lead time
Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011-2012, Pages 80-106]
-
Process Capability
Estimating Process Capability Indices Using Univariate g and h Distribution [Volume 5, Issue 2, 2011-2012, Pages 120-127]
Q
-
Queueing system
Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011-2012, Pages 52-62]
R
-
Risk Management
Development of a Generic Risk Matrix to Manage Project Risks [Volume 5, Issue 1, 2011-2012, Pages 35-51]
-
Risk Matrix
Development of a Generic Risk Matrix to Manage Project Risks [Volume 5, Issue 1, 2011-2012, Pages 35-51]
-
Runway
A Note on Runway Capacity Definition and Safety [Volume 5, Issue 4, 2011-2012, Pages 240-244]
S
-
Seller-Buyer Supply Chain
Coordinating a Seller-Buyer Supply Chain with a Proper Allocation of Chain’s Surplus Profit Using a General Side-Payment Contract [Volume 5, Issue 2, 2011-2012, Pages 63-79]
-
Sequence-dependent
Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011-2012, Pages 142-153]
-
Sequential Experimental
Design
Development of PSPO Simulation Optimization Algorithm [Volume 5, Issue 3, 2011-2012, Pages 128-141]
-
Setup time
Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011-2012, Pages 142-153]
-
Simulation Optimization
Development of PSPO Simulation Optimization Algorithm [Volume 5, Issue 3, 2011-2012, Pages 128-141]
-
Stochastic dynamic programming
A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2011-2012, Pages 198-207]
-
Stochastic inventory
Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011-2012, Pages 80-106]
-
Stochastic simulation
Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand [Volume 5, Issue 4, 2011-2012, Pages 208-229]
-
Supply Chain Contracts
Coordinating a Seller-Buyer Supply Chain with a Proper Allocation of Chain’s Surplus Profit Using a General Side-Payment Contract [Volume 5, Issue 2, 2011-2012, Pages 63-79]
-
Supply chain management
Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011-2012, Pages 80-106]
-
Supply chain management
An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply [Volume 5, Issue 3, 2011-2012, Pages 154-174]
T
-
Tabu Search
The P-Center Problem under Uncertainty [Volume 5, Issue 3, 2011-2012, Pages 175-184]
-
Tow-echelon supply chain
Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011-2012, Pages 52-62]
-
Tukey Univariate g and h Distribution
Estimating Process Capability Indices Using Univariate g and h Distribution [Volume 5, Issue 2, 2011-2012, Pages 120-127]
U
-
Unreliable Supply
An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply [Volume 5, Issue 3, 2011-2012, Pages 154-174]
Your query does not match with any item