Keyword Index

A

  • Academic performance Efficiency Analysis of Public Universities in Iran Using DEA Approach: Importance of Stakeholder’s Perspective [Volume 5, Issue 4, 2011-2012, Pages 185-197]
  • Advantages of CM A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011-2012, Pages 20-34]
  • AHP A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011-2012, Pages 20-34]
  • Air Transportation A Note on Runway Capacity Definition and Safety [Volume 5, Issue 4, 2011-2012, Pages 240-244]

B

  • Base stock policy Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011-2012, Pages 52-62]
  • Basic period A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011-2012, Pages 1-19]

C

  • Capacity A Note on Runway Capacity Definition and Safety [Volume 5, Issue 4, 2011-2012, Pages 240-244]
  • Cellular Manufacturing A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011-2012, Pages 20-34]
  • Cellular manufacturing system(CMS) Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011-2012, Pages 142-153]
  • Contingency Planning Development of a Generic Risk Matrix to Manage Project Risks [Volume 5, Issue 1, 2011-2012, Pages 35-51]
  • Continuous Review Policy An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply [Volume 5, Issue 3, 2011-2012, Pages 154-174]
  • Control Threshold Policy A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2011-2012, Pages 198-207]

D

  • Data Envelopment Analysis Efficiency Analysis of Public Universities in Iran Using DEA Approach: Importance of Stakeholder’s Perspective [Volume 5, Issue 4, 2011-2012, Pages 185-197]
  • Defectives A Queueing-Inventory System with Repair Center for Defective Items and One-for-One Ordering Policy [Volume 5, Issue 4, 2011-2012, Pages 230-239]
  • Determining lot sizes A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011-2012, Pages 1-19]

E

  • Efficiency Efficiency Analysis of Public Universities in Iran Using DEA Approach: Importance of Stakeholder’s Perspective [Volume 5, Issue 4, 2011-2012, Pages 185-197]
  • Exponential Distribution A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2011-2012, Pages 198-207]

F

  • Facility location The P-Center Problem under Uncertainty [Volume 5, Issue 3, 2011-2012, Pages 175-184]
  • Finite planning horizon A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011-2012, Pages 1-19]
  • Flexible Flow Line Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line [Volume 5, Issue 2, 2011-2012, Pages 107-119]
  • Flow shop A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011-2012, Pages 1-19]
  • Fuzzy chance constrained programming Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand [Volume 5, Issue 4, 2011-2012, Pages 208-229]

G

  • Genetic algorithm Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011-2012, Pages 142-153]
  • Genetic algorithm Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand [Volume 5, Issue 4, 2011-2012, Pages 208-229]

H

  • Hybrid particle swarm optimization A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011-2012, Pages 1-19]

I

  • Inventory Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011-2012, Pages 52-62]
  • Inventory control A Queueing-Inventory System with Repair Center for Defective Items and One-for-One Ordering Policy [Volume 5, Issue 4, 2011-2012, Pages 230-239]

L

  • Lot sizing Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line [Volume 5, Issue 2, 2011-2012, Pages 107-119]

M

  • Machine Replacement Policy A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2011-2012, Pages 198-207]
  • Manufacturing system A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011-2012, Pages 20-34]
  • Mathematical Modelling Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line [Volume 5, Issue 2, 2011-2012, Pages 107-119]
  • Multi objective capacitated arc routing problem Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand [Volume 5, Issue 4, 2011-2012, Pages 208-229]

N

  • Nested Partition Algorithm Development of PSPO Simulation Optimization Algorithm [Volume 5, Issue 3, 2011-2012, Pages 128-141]
  • Non-Zero Lead-time An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply [Volume 5, Issue 3, 2011-2012, Pages 154-174]

O

  • One-for-one ordering A Queueing-Inventory System with Repair Center for Defective Items and One-for-One Ordering Policy [Volume 5, Issue 4, 2011-2012, Pages 230-239]

P

  • Pareto ranking Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand [Volume 5, Issue 4, 2011-2012, Pages 208-229]
  • Particle Swarm Optimization Algorithm Development of PSPO Simulation Optimization Algorithm [Volume 5, Issue 3, 2011-2012, Pages 128-141]
  • Part-level Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011-2012, Pages 142-153]
  • P-Center The P-Center Problem under Uncertainty [Volume 5, Issue 3, 2011-2012, Pages 175-184]
  • Perishable items Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011-2012, Pages 80-106]
  • Poisson demand Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011-2012, Pages 80-106]
  • Poisson demand A Queueing-Inventory System with Repair Center for Defective Items and One-for-One Ordering Policy [Volume 5, Issue 4, 2011-2012, Pages 230-239]
  • Poisson Demand An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply [Volume 5, Issue 3, 2011-2012, Pages 154-174]
  • Positive lead time Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011-2012, Pages 80-106]
  • Process Capability Estimating Process Capability Indices Using Univariate g and h Distribution [Volume 5, Issue 2, 2011-2012, Pages 120-127]

Q

  • Queueing system Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011-2012, Pages 52-62]

R

  • Risk Management Development of a Generic Risk Matrix to Manage Project Risks [Volume 5, Issue 1, 2011-2012, Pages 35-51]
  • Risk Matrix Development of a Generic Risk Matrix to Manage Project Risks [Volume 5, Issue 1, 2011-2012, Pages 35-51]
  • Runway A Note on Runway Capacity Definition and Safety [Volume 5, Issue 4, 2011-2012, Pages 240-244]

S

  • Seller-Buyer Supply Chain Coordinating a Seller-Buyer Supply Chain with a Proper Allocation of Chain’s Surplus Profit Using a General Side-Payment Contract [Volume 5, Issue 2, 2011-2012, Pages 63-79]
  • Sequence-dependent Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011-2012, Pages 142-153]
  • Sequential Experimental Design Development of PSPO Simulation Optimization Algorithm [Volume 5, Issue 3, 2011-2012, Pages 128-141]
  • Setup time Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011-2012, Pages 142-153]
  • Simulation Optimization Development of PSPO Simulation Optimization Algorithm [Volume 5, Issue 3, 2011-2012, Pages 128-141]
  • Stochastic dynamic programming A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2011-2012, Pages 198-207]
  • Stochastic inventory Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011-2012, Pages 80-106]
  • Stochastic simulation Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand [Volume 5, Issue 4, 2011-2012, Pages 208-229]
  • Supply Chain Contracts Coordinating a Seller-Buyer Supply Chain with a Proper Allocation of Chain’s Surplus Profit Using a General Side-Payment Contract [Volume 5, Issue 2, 2011-2012, Pages 63-79]
  • Supply chain management Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011-2012, Pages 80-106]
  • Supply chain management An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply [Volume 5, Issue 3, 2011-2012, Pages 154-174]

T

  • Tabu Search The P-Center Problem under Uncertainty [Volume 5, Issue 3, 2011-2012, Pages 175-184]
  • Tow-echelon supply chain Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011-2012, Pages 52-62]
  • Tukey Univariate g and h Distribution Estimating Process Capability Indices Using Univariate g and h Distribution [Volume 5, Issue 2, 2011-2012, Pages 120-127]

U

  • Unreliable Supply An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply [Volume 5, Issue 3, 2011-2012, Pages 154-174]