Author Index

A

  • Akhavan Niaki, Seyed Taghi A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2012, Pages 198-207]
  • Aliabadi, Mohammad A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011, Pages 1-19]
  • Arivarignan, G. Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011, Pages 80-106]
  • Arunkumar, Natesan A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011, Pages 20-34]

B

  • Bhuiyan, Nadia Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011, Pages 142-153]
  • Bijari, Mehdi Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line [Volume 5, Issue 2, 2011, Pages 107-119]

C

  • Chauhan, Stayaveer.S. Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011, Pages 142-153]
  • Clark, Alistair Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line [Volume 5, Issue 2, 2011, Pages 107-119]

D

  • Damle, Siddharth B. Development of a Generic Risk Matrix to Manage Project Risks [Volume 5, Issue 1, 2011, Pages 35-51]
  • Das, Nandini Estimating Process Capability Indices Using Univariate g and h Distribution [Volume 5, Issue 2, 2011, Pages 120-127]

E

  • Eshghi, Kourosh Coordinating a Seller-Buyer Supply Chain with a Proper Allocation of Chain’s Surplus Profit Using a General Side-Payment Contract [Volume 5, Issue 2, 2011, Pages 63-79]
  • Eydi, Alireza Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand [Volume 5, Issue 4, 2012, Pages 208-229]

F

  • Fallah Nezhad, Mohammad Saber A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2012, Pages 198-207]

G

  • Ghalebsaz Jeddi, Babak A Note on Runway Capacity Definition and Safety [Volume 5, Issue 4, 2012, Pages 240-244]
  • Ghassemi-Tari, Farhad Development of PSPO Simulation Optimization Algorithm [Volume 5, Issue 3, 2011, Pages 128-141]
  • Grantham, Katie Development of a Generic Risk Matrix to Manage Project Risks [Volume 5, Issue 1, 2011, Pages 35-51]

H

  • Haji, Alireza Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011, Pages 52-62]
  • Haji, Alireza A Queueing-Inventory System with Repair Center for Defective Items and One-for-One Ordering Policy [Volume 5, Issue 4, 2012, Pages 230-239]
  • Haji, Babak A Queueing-Inventory System with Repair Center for Defective Items and One-for-One Ordering Policy [Volume 5, Issue 4, 2012, Pages 230-239]
  • Haji, Rasoul Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011, Pages 52-62]

J

  • Javazi, Leila Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand [Volume 5, Issue 4, 2012, Pages 208-229]
  • Jenabi, Masoud A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011, Pages 1-19]
  • Jolai, Fariborz A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011, Pages 1-19]

K

  • Karunamoorthy, Loganathan A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011, Pages 20-34]

M

  • Mahdieh, Masoumeh Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line [Volume 5, Issue 2, 2011, Pages 107-119]
  • Masihabadi (1985-2011), Sina Coordinating a Seller-Buyer Supply Chain with a Proper Allocation of Chain’s Surplus Profit Using a General Side-Payment Contract [Volume 5, Issue 2, 2011, Pages 63-79]
  • Mehdizadeh, Esmaeil A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011, Pages 1-19]
  • Murray, Susan L. Development of a Generic Risk Matrix to Manage Project Risks [Volume 5, Issue 1, 2011, Pages 35-51]
  • Muthukumar, Sambandam A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011, Pages 20-34]

O

  • Omranpour, Zohreh Development of PSPO Simulation Optimization Algorithm [Volume 5, Issue 3, 2011, Pages 128-141]

P

  • Pourghannad, Behrooz An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply [Volume 5, Issue 3, 2011, Pages 154-174]

R

  • Rajkumar, M. Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011, Pages 80-106]

S

  • Sadegheih, Ahmad A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2012, Pages 198-207]
  • Saffari, Mohammad Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011, Pages 52-62]
  • Safi, Mahsa Efficiency Analysis of Public Universities in Iran Using DEA Approach: Importance of Stakeholder’s Perspective [Volume 5, Issue 4, 2012, Pages 185-197]
  • Sajadifar, Mehdi An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply [Volume 5, Issue 3, 2011, Pages 154-174]
  • Sharifi, Shahram Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011, Pages 142-153]
  • Shavandi, Hassan The P-Center Problem under Uncertainty [Volume 5, Issue 3, 2011, Pages 175-184]
  • Sivakumar, B. Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011, Pages 80-106]
  • S.Monfared, M.A. Efficiency Analysis of Public Universities in Iran Using DEA Approach: Importance of Stakeholder’s Perspective [Volume 5, Issue 4, 2012, Pages 185-197]

T

  • Taghavi, Majid The P-Center Problem under Uncertainty [Volume 5, Issue 3, 2011, Pages 175-184]