Abdelgawad A.M., Watanabe K, Mohammed M and Takeuchi, S 2010. Estimating groundwater residence time using multiple regression model based on fluoride dissolution: an exploration of possibilities, Environmental Earth Sciences 60(3), 449-462.
Bennett, R.D., and Ariaratnam, S.T., 2008. Horizontal Directional Drilling Good Practices Guidelines (3rd ed.). Virginia: HDD Consortium, Arlington.
Bi, G., Feng, C., Ding, J., Khan, K. R. 2012. Estimating relative efficiency of DMU: Pareto Principle and Monte Carlo oriented DEA approach. Infor, 50(1), 44-57.
Carlin, M. C. 2014. A Comparative Analysis of Horizontal Directional Drilling Construction Methods in Mainland China. A Dissertation Presented in Partial Fulfillment of the Requirements for the Degree Doctor of Philosophy.
Gierczak, M, 2014 (1). The quantitative risk assessment of MINI, MIDI and MAXI Horizontal Directional Drilling Projects applying Fuzzy Fault Tree Analysis. Tunnelling and Underground Space Technology 43 67–77.
Gierczak, M, 2014 (2). The qualitative risk assessment of MINI, MIDI and MAXI horizontal directional drilling projects. Tunnelling and Underground Space Technology. 44 148–156.
Hashash, Y. M. A., & Javier, J. 2011. Evaluation of horizontal directional drilling (HDD). Urbana, Ill: Illinois Center for Transportation.
Hashemi, S.H., Karimi, A, Tavana, M. 2015. An integrated green supplier selection approach with analytic network process and improved Grey relational analysis, Int. J. Production Economics, 159, 178-191.
Kang, C.C., Feng, C.M. and Khan, H.A., 2005. Risk assessment for build-operate-transfer projects: A dynamic multi-objective programming approach. Computer and Operations Research, 32, 1633-1654.
KarimiAzari, A.R, Mousavi, N, Mousavi, S.F, Hosseini, S.B. 2011. Risk assessment model selection in construction industry. Expert Systems with Applications (38), 9105–9111.
Ma, B., Najafi, M., Shen, H., and Wu, L. 2010. Risk Evaluation for Maxi Horizontal Directional Drilling Crossing Projects. Journal of Pipeline Systems Engineering and Practice, 1(2), 91-97.
Mawford, N, 2009. Avoid Wellbore Stability Problems with Casing Drilling. E&P Journal, 18.
Moganti, P.Y., 2016. Safety Risk Investigation of Horizontal Directional Drilling Projects, Clemson University.
Nitro-Morote, A, Ruz-Vila, F. 2011. A fuzzy approach to construction project risk assessment. International Journal of Project Management, 220-231.
Önüt, S, Kara, S. S., Isik, E. 2009. Long term supplier selection using a combined fuzzy MCDM approach: A case study for a telecommunication company. Expert System with Applications, 36, 3887-3895.
Saaty, T. L. (1996). Decision making with dependence and feedback: The analytic network process (Vol. 4922). RWS Publication.
Skogdalen, J.S, Vinnem, J.E, 2012. Quantitative risk analysis of oil and gas drilling, using Deepwater Horizon as case study, Reliability Engineering and System Safety, 100 58–66.
Van Staveren, M. 2007. Uncertainty and ground conditions. A risk management approach. Burlington, Butterworth-Heinemann.
Wang F, Ren T, Tu S, Hungerford F, Aziz N, 2012. Implementation of underground long-hole directional drilling technology for greenhouse gas mitigation in Chinese coal mines. 11, 78-96.
Winter, J.C.F., 2013. Using the student’s t-test with extremely small sample sizes, Practical Assessment, Research & Evaluation, 18(10).
Zhang, P, Luo, P, Wu, Y, and Huang, Y, 2011. The Status, Development, and Key Technologies of Pipeline Directional Drill Project. Proceedings of the International Conference on Pipelines and Trenchless Technologies (pp. 2338-2349). Beijjing: American Society of Civil Engineers.
Zheng, J., An, M., and Smith, N.J., 2007. Application of a fuzzy based decision making methodology to construct project risk assessment. International Journal of Project Management, 25, 589-600.