An economic-statistical model for production and maintenance planning under adaptive non-central chi-square control chart

Document Type : Research Paper

Authors

Department of Industrial Engineering, Faculty of Engineering, University of Qom, Qom, Iran

Abstract

Most of the inventory control models assume that quality defect never happens, which means production process is perfect. However, in real manufacturing processes, the production process starts its operation in the in-control state; but after a period of time, shifts to the out-of-control state because of occurrence of some disturbances. In this paper, in order to approach the model to real manufacturing conditions, a process is considered in which quality defect and machine deterioration may occur. Since the adaptive control charts detect the occurrence of assignable cause quicker than the traditional control charts, an adaptive non-central chi-square control chart is designed, which monitors the process mean and variance, simultaneously. In addition, to reduce the failure rate of the machine, two types of maintenance policies consisting of reactive and preventive are planned. Then, the particle swarm optimization algorithm is employed to minimize the overall cost per cycle involving inventory cost, quality loss cost, inspection cost and maintenance cost subject to statistical quality constraints. Finally, to demonstrate the effectiveness of the suggested approach, two comparative studies are presented. The first one confirms that integration of production planning, maintenance policy and statistical process monitoring leads to a significant increase in the cost savings. The second one indicates superiority of the developed adaptive control chart in comparison with the control chart with the fixed parameters.

Keywords

Main Subjects


Alamri, A. A., Harris, I., & Syntetos, A. A. (2016). Efficient inventory control for imperfect quality items. European Journal of Operational Research,254(1), 92-104.
Alinaghian, M., Ghazanfari, M., & Hamedani, S. G. (2017). A new bi-objective periodic vehicle routing problem with maximization market share in an uncertain competitive environment. Computational and Applied Mathematics, 1-23.
Ardakan, M. A., Hamadani, A. Z., Sima, M., & Reihaneh, M. (2016). A hybrid model for economic design of MEWMA control chart under maintenance policies. The International Journal of Advanced Manufacturing Technology, 83(9), 2101-2110.
Askari, E. A., & Bashiri, M. (2017). Design of a public bicycle-sharing system with safety. Computational and Applied Mathematics, 36(2), 2023-2041.
Azimifar, A., & Payan, S. (2016). Enhancement of heat transfer of confined enclosures with free convection using blocks with PSO algorithm. Applied Thermal Engineering101, 79-91.
Ben-Daya, M., & Makhdoum, M. (1998). Integrated production and quality model under various preventive maintenance policies. Journal of the Operational Research Society, 840-853.
Ben-Daya, M., & Rahim, M. A. (2000). Effect of maintenance on the economic design of x-control chart. European Journal of Operational Research120(1), 131-143.
Boukas, E. K., & Liu, Z. K. (2001). Production and maintenance control for manufacturing systems. Automatic Control, IEEE Transactions on46(9), 1455-1460.
Bouslah, B., Gharbi, A., & Pellerin, R. (2016). Joint economic design of production, continuous sampling inspection and preventive maintenance of a deteriorating production system. International Journal of Production Economics173, 184-198.
Clempner, J. B., & Poznyak, A. S. (2016). Constructing the Pareto front for multi-objective Markov chains handling a strong Pareto policy approach. Computational and Applied Mathematics, 1-25.
Costa, A. F. (1993). Joint economic design of X and R control charts for processes subject to two independent assignable causes. IIE transactions,25(6), 27-33.
Costa, A. F. (1994).  charts with variable sample size. Journal of Quality Technology, 26(3), 155-163.
Costa, A. F. (1998). Joint X and R charts with variable parameters. IIE transactions, 30(6), 505-514.
Costa, A. F. (1999). Joint X and R charts with variable sample sizes and sampling intervals. Journal of Quality Technology, 31(4), 387.
Costa, A. F. (1999b).  charts with variable parameters. Journal of Quality Technology, 31(4), 408-416.
Costa, A. F., & De Magalhaes, M. S. (2007). An adaptive chart for monitoring the process mean and variance. Quality and Reliability Engineering International, 23(7), 821-831.
Costa, A. F. B., & Rahim, M. A. (2004). Monitoring process mean and variability with one non-central chi-square chart. Journal of Applied Statistics, 31(10), 1171-1183.
Foumani, M., Gunawan, I., & Smith-Miles, K. (2015). Resolution of deadlocks in a robotic cell scheduling problem with post-process inspection system: Avoidance and recovery scenarios. IEEE International Conference on Industrial Engineering and Engineering Management, pages: 1107-1111, Bangkok, Thailand.
Foumani, M., Smith-Miles, K., & Gunawan, I. (2017). Scheduling of two-machine robotic rework cells: In-process, post-process and in-line inspection scenarios. Robotics and Autonomous Systems, 91, 210-225.
Foumani, M., Smith-Miles, K., Gunawan, I., & Moeini, A. (2017). A framework for stochastic scheduling of two-machine robotic rework cells with in-process inspection system. Computers & Industrial Engineering, 112, 492-502.
Gharbi, A., & Kenne, J. P. (2003). Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems. IIE transactions35(10), 941-952.
Jiang  Y,  Chen  M,  Zhou  D (2015).  Joint  optimization  of  preventive  maintenance  and inventory  policies  for  multi-unit  systems  subject  to  deteriorating  spare  part inventory.  Journal of Manufacturing Systems;35:191–205
Jones, L. L., & Case, K. E. (1981). Economic Design of a Joint X-and R-Control Chart. IIE transactions13(2), 182-195.
Kenndy, J., & Eberhart, R. C. (1995). Particle swarm optimization. Proceedings of IEEE International Conference on Neural Networks 1942-1948.
Lakhbab, H., & El Bernoussi, S. (2016). Hybrid nonmonotone spectral gradient method for the unconstrained minimization problem. Computational and Applied Mathematics, 1-10.
Lam, K. K., & Rahim, M. A. (2002). A sensitivity analysis of an integrated model for joint determination of economic design of control charts, economic production quantity and production run length for a deteriorating production system. Quality and Reliability Engineering International18(4), 305-320.
Mohamadi, M., Foumani, M., & Abbasi, B. (2011). Process Capability Analysis in the Presence of Autocorrelation. Journal of Optimization in Industrial Engineering, 15-20.
Nourelfath, M., Nahas, N., & Ben-Daya, M. (2016). Integrated preventive maintenance and production decisions for imperfect processes. Reliability Engineering & System Safety148, 21-31.
Ohta, H., Kimura, A., & Rahim, A. (2002). An economic model for (X) over-bar and R charts with time-varying parameters. Quality and Reliability Engineering International18(2), 131-139.
Pan, E. S., Jin, Y., & Wang, Y. (2011). Integration of economic production quantity in optimization design of control chart based on loss function and random process shift. Journal of Manufacturing Technology Management,22(7), 929-946.
Pan, E., Jin, Y., Wang, S., & Cang, T. (2012). An integrated EPQ model based on a control chart for an imperfect production process. International Journal of Production Research50(23), 6999-7011.
Porteus, E. L. (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operations research34(1), 137-144.
Prabhu, S. S., Runger, G. C., & Keats, J. B. (1993). X chart with adaptive sample sizes. International Journal of Production Research, 31(12), 2895-2909.
Prabhu, S. S., Montgomery, D. C., & Runger, G. C. (1994). A combined adaptive sample size and sampling interval X control scheme. Journal of Quality Technology, 26(3), 164-176.
Rahim, M. A. (1989). Determination of optimal design parameters of joint X and R charts. Journal of Quality Technology21(1), 65-70.
Rahim, M. A. (1994). Joint determination of production quantity, inspection schedule, and control chart design. IIE transactions26(6), 2-11.
Rahim, M. A., & Ben-Daya, M. (1998). A generalized economic model for joint determination of production run, inspection schedule and control chart design. International Journal of Production Research36(1), 277-289.
Rahim, M. A., & Costa, A. F. (2000). Joint economic design of X and R charts under Weibull shock models. International Journal of Production Research38(13), 2871-2889.
Rahim, M. A., & Ohta, H. (2005). An integrated economic model for inventory and quality control problems. Engineering Optimization, 37(1), 65-81.
Reynolds, M. R., Amin, R. W., Arnold, J. C., & Nachlas, J. A. (1988). Charts with variable sampling intervals. Technometrics30(2), 181-192.
Rivera-Gómez, H., Gharbi, A., & Kenné, J. P. (2013). Joint production and major maintenance planning policy of a manufacturing system with deteriorating quality. International Journal of Production Economics, 146(2), 575-587.
Rosenblatt, M. J., & Lee, H. L. (1986). Economic production cycles with imperfect production processes. IIE transactions18(1), 48-55.
Salmasnia, A., Abdzadeh, B., Namdar, M.R. (2017). A joint design of production run length, maintenance policy and control chart with multiple assignable causes. Journal of Manufacturing Systems, 42(1), 44-56.
Saniga, E. M. (1989). Economic statistical control-chart designs with an application to and R charts. Technometrics31(3), 313-320.
Tagaras, G. (1988). An integrated cost model for the joint optimization of process control and maintenance. Journal of the Operational Research Society, 757-766.
Xiang, Y. (2013). Joint optimization of control chart and preventive maintenance policies: A discrete-time Markov chain approach. European Journal of Operational Research, 229(2), 382-390.