Number of Articles: 387
51. A Quartic Quality Loss Function and Its Properties

Volume 1, Issue 1, Spring 2007, Pages 8-22

Yahya Fathi; Chanwut Poonthanomsook


52. A Possibility Linear Programming Approach to Solve a Fuzzy Single Machine Scheduling Problem

Volume 1, Issue 2, Summer 2007, Pages 116-129

I.N. Kamalabadi; A.H. Mirzaei; B. Javadi


53. One-for-One Period Policy and its Optimal Solution

Volume 1, Issue 3, Autumn 2007, Pages 200-217

Rasoul Haji; Alireza Haji


54. A Goal Programming Method for Finding Common Weights in DEA with an Improved Discriminating Power for Efficiency

Volume 1, Issue 4, Winter 2008, Pages 293-303

A. Makui; A. Alinezhad; R. Kiani Mavi; M. Zohrehbandian


55. Determining Optimal Number of Suppliers in a Multiple Sourcing Model under Stochastic Lead Times

Volume 2, Issue 1, Spring 2008, Pages 16-27

Mohammad Reza Akbari Jokar; Mohsen Sheikh Sajadieh


56. Predicting Customer-Expectation-Based Warranty Cost for Smaller-the- Better and Larger-the-Better Performance Characteristics

Volume 2, Issue 2, Summer 2008, Pages 97-113

Naresh K. Sharma; David Drain; Elizabeth A. Cudney; Kenneth M. Ragsdell; Kioumars Paryani


57. Implementation of a Lean Model for Carrying out Value Stream Mapping in a Manufacturing Industry

Volume 2, Issue 3, Autumn 2008, Pages 180-196

V. Ramesh1; K.V. Sreenivasa Prasad; T.R. Srinivas


58. Hybrid Probabilistic Search Methods for Simulation Optimization

Volume 2, Issue 4, Winter 2009, Pages 259-270

Alireza Kabirian


59. Quality Tools to Reduce Crankshaft Forging Defects: An Industrial Case Study

Volume 3, Issue 1, Spring 2009, Pages 27-37

Pankaj Chandna; Arunesh Chandra


60. A Markov Model for Performance Evaluation of Coal Handling Unit of a Thermal Power Plant

Volume 3, Issue 2, Summer 2009, Pages 85-96

Sorabh Gupta; P.C. Tewari; Avdhesh Kr. Sharma


63. Budgetary Constraints and Idle Time Allocation in Common-Cycle Production with non-zero Setup Time

Volume 4, Issue 1, Spring 2010, Pages 18-32

Rasoul Haji; Alireza Haji; Ali Ardalan


64. New Approach in Fitting Linear Regression Models with the Aim of Improving Accuracy and Power

Volume 4, Issue 2, Summer 2010, Pages 95-113

Soheil Sadeghi; Hashem Mahlooji


65. A Set of Algorithms for Solving the Generalized Tardiness Flowshop Problems

Volume 4, Issue 3, Autumn 2010, Pages 156-166

Farhad Ghassemi-Tari; Laya Olfat


66. A Comprehensive Fuzzy Multiobjective Supplier Selection Model under Price Brakes and Using Interval Comparison Matrices

Volume 4, Issue 4, Winter 2011, Pages 224-244

Mehdi Seifbarghy; Ali Pourebrahim Gilkalayeh; Mehran Alidoost


67. A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process

Volume 5, Issue 1, Spring 2011, Pages 20-34

Natesan Arunkumar; Loganathan Karunamoorthy; Sambandam Muthukumar


68. Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time

Volume 5, Issue 2, Summer 2011, Pages 80-106

M. Rajkumar; B. Sivakumar; G. Arivarignan


69. Part-level Sequence Dependent Setup Time Reduction in CMS

Volume 5, Issue 3, Autumn 2011, Pages 142-153

Shahram Sharifi; Stayaveer.S. Chauhan; Nadia Bhuiyan


70. A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming

Volume 5, Issue 4, Winter 2012, Pages 198-207

Mohammad Saber Fallah Nezhad; Seyed Taghi Akhavan Niaki; Ahmad Sadegheih


71. A Comparison of Four Multi-Objective Meta-Heuristics for a Capacitated Location-Routing Problem

Volume 6, Issue 1, Spring 2012, Pages 20-33

Farshid Samaei; Mahdi Bashiri; Reza Tavakkoli-Moghaddam


72. Developing EOQ model with instantaneous deteriorating items for a Vendor-Managed Inventory (VMI) system

Volume 7, Issue 1, Autumn 2014, Pages 21-42

Roya Tat; Maryam Esmaeili; Ataollah Taleizadeh


74. A new mathematical model for intensity matrix decomposition using multileaf collimator

Volume 8, Issue 2, Spring 2015, Pages 13-29

Vahid Mahmoodian; ahmad Makui; Mohammad Reza Gholamian