Alamri, A. A., Harris, I., & Syntetos, A. A. (2016). Efficient inventory control for imperfect quality items. European Journal of Operational Research,254(1), 92-104.
Alinaghian, M., Ghazanfari, M., & Hamedani, S. G. (2017). A new bi-objective periodic vehicle routing problem with maximization market share in an uncertain competitive environment. Computational and Applied Mathematics, 1-23.
Ardakan, M. A., Hamadani, A. Z., Sima, M., & Reihaneh, M. (2016). A hybrid model for economic design of MEWMA control chart under maintenance policies. The International Journal of Advanced Manufacturing Technology, 83(9), 2101-2110.
Askari, E. A., & Bashiri, M. (2017). Design of a public bicycle-sharing system with safety. Computational and Applied Mathematics, 36(2), 2023-2041.
Azimifar, A., & Payan, S. (2016). Enhancement of heat transfer of confined enclosures with free convection using blocks with PSO algorithm. Applied Thermal Engineering, 101, 79-91.
Ben-Daya, M., & Makhdoum, M. (1998). Integrated production and quality model under various preventive maintenance policies. Journal of the Operational Research Society, 840-853.
Ben-Daya, M., & Rahim, M. A. (2000). Effect of maintenance on the economic design of x-control chart. European Journal of Operational Research, 120(1), 131-143.
Boukas, E. K., & Liu, Z. K. (2001). Production and maintenance control for manufacturing systems. Automatic Control, IEEE Transactions on, 46(9), 1455-1460.
Bouslah, B., Gharbi, A., & Pellerin, R. (2016). Joint economic design of production, continuous sampling inspection and preventive maintenance of a deteriorating production system. International Journal of Production Economics, 173, 184-198.
Clempner, J. B., & Poznyak, A. S. (2016). Constructing the Pareto front for multi-objective Markov chains handling a strong Pareto policy approach. Computational and Applied Mathematics, 1-25.
Costa, A. F. (1993). Joint economic design of X and R control charts for processes subject to two independent assignable causes. IIE transactions,25(6), 27-33.
Costa, A. F. (1994). charts with variable sample size. Journal of Quality Technology, 26(3), 155-163.
Costa, A. F. (1998). Joint X and R charts with variable parameters. IIE transactions, 30(6), 505-514.
Costa, A. F. (1999). Joint X and R charts with variable sample sizes and sampling intervals. Journal of Quality Technology, 31(4), 387.
Costa, A. F. (1999b). charts with variable parameters. Journal of Quality Technology, 31(4), 408-416.
Costa, A. F., & De Magalhaes, M. S. (2007). An adaptive chart for monitoring the process mean and variance. Quality and Reliability Engineering International, 23(7), 821-831.
Costa, A. F. B., & Rahim, M. A. (2004). Monitoring process mean and variability with one non-central chi-square chart. Journal of Applied Statistics, 31(10), 1171-1183.
Foumani, M., Gunawan, I., & Smith-Miles, K. (2015). Resolution of deadlocks in a robotic cell scheduling problem with post-process inspection system: Avoidance and recovery scenarios. IEEE International Conference on Industrial Engineering and Engineering Management, pages: 1107-1111, Bangkok, Thailand.
Foumani, M., Smith-Miles, K., & Gunawan, I. (2017). Scheduling of two-machine robotic rework cells: In-process, post-process and in-line inspection scenarios. Robotics and Autonomous Systems, 91, 210-225.
Foumani, M., Smith-Miles, K., Gunawan, I., & Moeini, A. (2017). A framework for stochastic scheduling of two-machine robotic rework cells with in-process inspection system. Computers & Industrial Engineering, 112, 492-502.
Gharbi, A., & Kenne, J. P. (2003). Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems. IIE transactions, 35(10), 941-952.
Jiang Y, Chen M, Zhou D (2015). Joint optimization of preventive maintenance and inventory policies for multi-unit systems subject to deteriorating spare part inventory. Journal of Manufacturing Systems;35:191–205
Jones, L. L., & Case, K. E. (1981). Economic Design of a Joint X-and R-Control Chart. IIE transactions, 13(2), 182-195.
Kenndy, J., & Eberhart, R. C. (1995). Particle swarm optimization. Proceedings of IEEE International Conference on Neural Networks 1942-1948.
Lakhbab, H., & El Bernoussi, S. (2016). Hybrid nonmonotone spectral gradient method for the unconstrained minimization problem. Computational and Applied Mathematics, 1-10.
Lam, K. K., & Rahim, M. A. (2002). A sensitivity analysis of an integrated model for joint determination of economic design of control charts, economic production quantity and production run length for a deteriorating production system. Quality and Reliability Engineering International, 18(4), 305-320.
Mohamadi, M., Foumani, M., & Abbasi, B. (2011). Process Capability Analysis in the Presence of Autocorrelation. Journal of Optimization in Industrial Engineering, 15-20.
Nourelfath, M., Nahas, N., & Ben-Daya, M. (2016). Integrated preventive maintenance and production decisions for imperfect processes. Reliability Engineering & System Safety, 148, 21-31.
Ohta, H., Kimura, A., & Rahim, A. (2002). An economic model for (X) over-bar and R charts with time-varying parameters. Quality and Reliability Engineering International, 18(2), 131-139.
Pan, E. S., Jin, Y., & Wang, Y. (2011). Integration of economic production quantity in optimization design of control chart based on loss function and random process shift. Journal of Manufacturing Technology Management,22(7), 929-946.
Pan, E., Jin, Y., Wang, S., & Cang, T. (2012). An integrated EPQ model based on a control chart for an imperfect production process. International Journal of Production Research, 50(23), 6999-7011.
Porteus, E. L. (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operations research, 34(1), 137-144.
Prabhu, S. S., Runger, G. C., & Keats, J. B. (1993). X chart with adaptive sample sizes. International Journal of Production Research, 31(12), 2895-2909.
Prabhu, S. S., Montgomery, D. C., & Runger, G. C. (1994). A combined adaptive sample size and sampling interval X control scheme. Journal of Quality Technology, 26(3), 164-176.
Rahim, M. A. (1989). Determination of optimal design parameters of joint X and R charts. Journal of Quality Technology, 21(1), 65-70.
Rahim, M. A. (1994). Joint determination of production quantity, inspection schedule, and control chart design. IIE transactions, 26(6), 2-11.
Rahim, M. A., & Ben-Daya, M. (1998). A generalized economic model for joint determination of production run, inspection schedule and control chart design. International Journal of Production Research, 36(1), 277-289.
Rahim, M. A., & Costa, A. F. (2000). Joint economic design of X and R charts under Weibull shock models. International Journal of Production Research, 38(13), 2871-2889.
Rahim, M. A., & Ohta, H. (2005). An integrated economic model for inventory and quality control problems. Engineering Optimization, 37(1), 65-81.
Reynolds, M. R., Amin, R. W., Arnold, J. C., & Nachlas, J. A. (1988). Charts with variable sampling intervals. Technometrics, 30(2), 181-192.
Rivera-Gómez, H., Gharbi, A., & Kenné, J. P. (2013). Joint production and major maintenance planning policy of a manufacturing system with deteriorating quality. International Journal of Production Economics, 146(2), 575-587.
Rosenblatt, M. J., & Lee, H. L. (1986). Economic production cycles with imperfect production processes. IIE transactions, 18(1), 48-55.
Salmasnia, A., Abdzadeh, B., Namdar, M.R. (2017). A joint design of production run length, maintenance policy and control chart with multiple assignable causes. Journal of Manufacturing Systems, 42(1), 44-56.
Saniga, E. M. (1989). Economic statistical control-chart designs with an application to and R charts. Technometrics, 31(3), 313-320.
Tagaras, G. (1988). An integrated cost model for the joint optimization of process control and maintenance. Journal of the Operational Research Society, 757-766.
Xiang, Y. (2013). Joint optimization of control chart and preventive maintenance policies: A discrete-time Markov chain approach. European Journal of Operational Research, 229(2), 382-390.